Client Log In

Click here to enter the client area

Part L Photographic Evidence Storage

What is Appendix B?

Part L 2021 now requires photographs of all thermal junctions in a dwelling, these photographs must time and date stamped, geo-tagged and have the Plot No: and Junction Reference included in them.

Online Storage

We can provide cloud storage space for the photographs required on our secure server, Appendix B states that photographs must be stored for 15 years

Site Photo Apps

We are currently working on a new app which will be available on both Andoid & Iphone phones that will automatically embed the required data.

Fully compliant reports

Once all the photgraphs have been collated we will produce a fully Part L Apppendix B compliant report for Building Control and also give them access to the photgraphs for future auditing.

DON'T GET
CAUGHT OUT

Failure to take photgraphs of all the thermal junctions for every plot on the site could mean delays or possibly even refusal to produce the EPC.

Once you register with our site we will send you a list of photgraphs required for each Plot as well as examples of how to take the photograph to ensure compliance. Using our system we will be able to confirm that the photograph taken is clear and covers the required elements of the junction, and if there is a problem we can notify you straight away to retake it and offer advice, this ensures nothing is left to chance at the end of the project.

We will produce the final report for Buidling Control which we guarantee will be fully compliant with Part L Appendix B, 

Latest News

Unlocking Efficiency: The Significance of Clear Photographs of Thermal Bridge Junctions under Part L UK Building Regulations 2022

Sitephoto.co.uk is a new online platform designed to provide a secure storage system for photographs of thermal junctions in buildings

The importance of Appendix B

Capturing the heat

What to Photograph?

Part L 2021 what you need to know

GET IN TOUCH

020 86386418

info@sitephoto.co.uk